20809 SBP NED S F Route

 
Search another train›
Find a train
20809SBP NED S FSuper Fast
18:30VZMVizianagram Jn
19:10 hr1019 km
13:40NEDH Sahib Nanded
MTWTFSS

Route12 stops · 1019 km

  1. 10:50Starts
    SambalpurSBP
    PF 5
  2. 11:1011:12
    AttabiraATS
    2mPF 1
  3. 11:3311:35
    Bargarh RoadBRGA
    2mPF 2
  4. 12:2512:30
    BalangirBLGR
    5mPF 2
  5. 13:2513:35
    TitlagarhTIG
    10mPF 2
  6. 13:5513:57
    KesingaKSNG
    2mPF 1
  7. 14:5514:57
    MunigudaMNGD
    2mPF 1
  8. 16:2516:30
    RayagadaRGDA
    5mPF 3
  9. 17:1017:12
  10. 17:3317:35
    Bobbili JnVBL
    2mPF 3
  11. 18:0018:02
  12. 18:2518:30
    0km
  13. 19:4020:00
    VisakhapatnamVSKP
    20mRL
    60km
  14. 22:4822:50
    RajamundryRJY
    2mPF 1
    261km
  15. 00:0800:10
    EluruEE
    2mPF 3Day 2
    351km
  16. 01:3501:40
    418km
  17. 04:4804:50
    Kazipet JnKZJ
    2mPF 2Day 2
    625km
  18. 06:4507:00
    744km
  19. 09:5810:00
    KamareddiKMC
    2mPF 2Day 2
    857km
  20. 10:4810:50
    NizamabadNZB
    2mPF 1Day 2
    909km
  21. 11:3311:35
    BasarBSX
    2mPF 1Day 2
    938km
  22. 12:4812:50
    Mudkhed JnMUE
    2mPF 1Day 2
    997km
  23. 13:40Ends
    H Sahib NandedNED
    PF 1Day 2
    1019km

Coach positionHistoric data

SLRD
GN
GN
S7
S6
S5
S4
S3
S2
S1
PC
A1
B1
B2
B3
B4
H1
B5
GN
GN
LPR

Seat layout

1 2 3     8
4 5 6 7
9 10 11   16
12 13 14   15
17 18 19   24
20 21 22   23
25 26 27   32
28 29 30   31
33 34 35   40
36 37 38   39
41 42 43   48
44 45 46   47
49 50 51   56
52 53 54   55
57 58 59   64
60 61 62   63
65 66 67   72
68 69 70   71
SL
Sleeper
शयनयान
UB
Upper Berth
ऊपरी बर्थ
MB
Middle Berth
मध्य बर्थ
LB
Lower Berth
निचली बर्थ
SL
Side Lower
साइड लोअर
SU
Side Upper
साइड ऊपरी

Train facts

Runs onM F Su
Classes1A 2A 3A SL GN
Travel time26 hr, 50 min
Avg speed55 km/hr
PantryAvailable
Food in fareNot included
ARP60 days
RailwayECOR (ECOR)
CategorySuper Fast
Fare typeSuperfast
GaugeBroad Gauge

About Train 20809 SBP NED S F

20809 SBP NED S F, Sambalpur to H Sahib Nanded runs M F Su, has classes 1A 2A 3A SL GN. Pantry is available. Fare does not include food cost. Total travel time of the train is 26 hr, 50 min. Average speed is 55 km/hr. Advance reservation period (ARP) is 60 days. 20809 SBP NED S F is owned by ECOR (ECOR). Its rake is shared with , . Superfast fare is applicable.20809 SBP NED S F category type is Super Fast. It is a Broad Gauge train.
This is historic data and does not represent current status.

Stations on this route