Home
 Spot Train
 PNR
 Trains between Stations & Seats
 Train Route
 Seats
 Fare
 Station Live
 Refund & Cancellation Charges
 Info
हिंदी
 Train Route

15022 GKP SHM EXPRESS Route

RouteLiveSeatsFare
StationArrDepHaltDist.DayPF
1GorakhpurFirst13.40001
M
2
2Deoria Sadar14.2514.2725012
3Bhatni Jn14.5014.5557112
4Mau Jn16.2016.25513911
5Aunrihar Jn17.1217.14219612
6Varanasi Jn18.1518.402523113
7Mughal Sarai Jn19.2519.452024814
8Sasaram20.4920.50134813
9Gaya Jn22.0522.10545114
10Gomoh Jn01.5502.00562122
11Bhojudih Jn02.4802.50266421
12Purulia Jn03.5303.55271322
13Tatanagar Jn05.3005.502080324
14Kharagpur Jn07.5007.55593722
15Shalimar09.55Last0105022
Coach Composition
En0
1
GS2
S8SL3
S7SL4
S6SL5
S5SL6
S4SL7
S3SL8
A12A9
B13A10
S2SL11
S1SL12
GS13
GS14
GS15
GS16
17
1 2 3     8
4 5 6 7
9 10 11   16
12 13 14   15
17 18 19   24
20 21 22   23
25 26 27   32
28 29 30   31
33 34 35   40
36 37 38   39
41 42 43   48
44 45 46   47
49 50 51   56
52 53 54   55
57 58 59   64
60 61 62   63
65 66 67   72
68 69 70   71
SL
Sleeper
शयनयान
UB
Upper Berth
ऊपरी बर्थ
MB
Middle Berth
मध्य बर्थ
LB
Lower Berth
निचली बर्थ
SL
Side Lower
साइड लोअर
SU
Side Upper
साइड ऊपरी
1 2 3     8
4 5 6 7
9 10 11   16
12 13 14   15
17 18 19   24
20 21 22   23
25 26 27   32
28 29 30   31
33 34 35   40
36 37 38   39
41 42 43   48
44 45 46   47
49 50 51   56
52 53 54   55
57 58 59   64
60 61 62   63
3A
3 Tier Sleeper
तृतीय वातानुकूलित
UB
Upper Berth
ऊपरी बर्थ
MB
Middle Berth
मध्य बर्थ
LB
Lower Berth
निचली बर्थ
SL
Side Lower
साइड लोअर
SU
Side Upper
साइड ऊपरी
1     6
3 4 5
7 8   12
9 10   11
13 14   18
15 16   17
19 20   24
21 22   23
25 26   30
27 28   29
31 32   36
33 34   35
37 38   42
39 40   41
43 44
45 46
2A
2 Tier Sleeper
द्वितीय वातानुकूलित
UB
Upper Berth
ऊपरी बर्थ
LB
Lower Berth
निचली बर्थ
SL
Side Lower
साइड लोअर
SU
Side Upper
साइड ऊपरी
15022 GKP SHM EXPRESS, Gorakhpur to Shalimar runs M, has classes 2A 3A SL GN. Pantry is not available. Fare does not include food cost. Total travel time of the train is 20 hr, 15 min. Average speed is 52 km/hr. Advance reservation period (ARP) is 120 days. The train is owned by NE (NE). Its rake is shared with . Mail Express fare is applicable. It is a Mail & Express train. It is a Broad Gauge train.