StationArrDepHaltDist.DayPF
1New DelhiFirst17.30001
Daily
7
2Ambala Cant Jn (PQ)20.1820.281019917
3Ludhiana Jn22.0522.151031212
4Jalandhar Cant23.0723.12536511
5Pathankot Cantt00.5501.00547822
6Jammu Tawi02.5503.051057722
7Udhampur04.0204.04263021
8Shmata Vd Katra05.10Last065521
Coach Composition
En0
GC1
BE13A2
B113A3
B103A4
B93A5
B83A6
B73A7
B63A8
B53A9
B43A10
B33A11
B23A12
B13A13
PC14
A52A15
A42A16
A32A17
A22A18
A12A19
H11A20
GC21
1 2 3     8
4 5 6 7
9 10 11   16
12 13 14   15
17 18 19   24
20 21 22   23
25 26 27   32
28 29 30   31
33 34 35   40
36 37 38   39
41 42 43   48
44 45 46   47
49 50 51   56
52 53 54   55
57 58 59   64
60 61 62   63
3A
3 Tier Sleeper
तृतीय वातानुकूलित
UB
Upper Berth
ऊपरी बर्थ
MB
Middle Berth
मध्य बर्थ
LB
Lower Berth
निचली बर्थ
SL
Side Lower
साइड लोअर
SU
Side Upper
साइड ऊपरी
1     6
3 4 5
7 8   12
9 10   11
13 14   18
15 16   17
19 20   24
21 22   23
25 26   30
27 28   29
31 32   36
33 34   35
37 38   42
39 40   41
43 44
45 46
2A
2 Tier Sleeper
द्वितीय वातानुकूलित
UB
Upper Berth
ऊपरी बर्थ
LB
Lower Berth
निचली बर्थ
SL
Side Lower
साइड लोअर
SU
Side Upper
साइड ऊपरी
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
1A
FIRST AC
वाता. प्रथम श्रेणी
UB
Upper Berth
ऊपरी बर्थ
LB
Lower Berth
निचली बर्थ
22461 SHRI SHAKTI EXP, New Delhi to Shmata Vd Katra runs Daily, has classes 1A 2A 3A. Pantry is available. Fare does not include food cost. Total travel time of the train is 11 hr, 40 min. Average speed is 56 km/hr. Advance reservation period (ARP) is 120 days. The train is owned by Northern Railway (NR). Its rake is shared with . Superfast fare is applicable. It is a Super Fast train. It is a Broad Gauge train.

IRCTC Agent eTicket booking with Zero fee
Kumbh Mela 2019