Home
Spot Train
PNR
Trains between Stations & Seats
Train Route
Seats
Fare
Station Live
Refund & Cancellation Charges
Info
हिंदी
 Train Route
RouteLiveSeatsFare

22993 BDTS MHV SUP EXP Route

StationArrDepHaltDist.DayPF
1Bandra TerminusFirst15.25001
Th
2Borivali15.5615.5821914
3Vapi
Pooled Quota
17.5317.5521591
4Surat19.3519.4052521
5Vadodara Jn21.5622.0153811
6Anand Jn22.4722.4924171
7Ahmedabad Jn00.1500.35204812
8Viramgam Jn01.4301.4525462
9Surendranagar Gate02.5402.55161121
10Botad Jn03.5303.5526862
11Dhola Jn04.3304.3527292
12Dhasa Jn04.5604.5827552
13Savarkundla05.4605.47181221
14Rajula Jn06.2206.24285121
15Mahuva Jn07.10Last08812
Coach Composition
En0
GC1
UR2
S9SL3
S8SL4
S7SL5
S6SL6
S5SL7
S4SL8
S3SL9
S2SL10
S1SL11
B13A12
A12A13
UR14
UR15
GC16
1 2 3     8
4 5 6 7
9 10 11   16
12 13 14   15
17 18 19   24
20 21 22   23
25 26 27   32
28 29 30   31
33 34 35   40
36 37 38   39
41 42 43   48
44 45 46   47
49 50 51   56
52 53 54   55
57 58 59   64
60 61 62   63
65 66 67   72
68 69 70   71
SL
Sleeper
शयनयान
UB
Upper Berth
ऊपरी बर्थ
MB
Middle Berth
मध्य बर्थ
LB
Lower Berth
निचली बर्थ
SL
Side Lower
साइड लोअर
SU
Side Upper
साइड ऊपरी
1 2 3     8
4 5 6 7
9 10 11   16
12 13 14   15
17 18 19   24
20 21 22   23
25 26 27   32
28 29 30   31
33 34 35   40
36 37 38   39
41 42 43   48
44 45 46   47
49 50 51   56
52 53 54   55
57 58 59   64
60 61 62   63
3A
3 Tier Sleeper
तृतीय वातानुकूलित
UB
Upper Berth
ऊपरी बर्थ
MB
Middle Berth
मध्य बर्थ
LB
Lower Berth
निचली बर्थ
SL
Side Lower
साइड लोअर
SU
Side Upper
साइड ऊपरी
1     6
3 4 5
7 8   12
9 10   11
13 14   18
15 16   17
19 20   24
21 22   23
25 26   30
27 28   29
31 32   36
33 34   35
37 38   42
39 40   41
43 44
45 46
2A
2 Tier Sleeper
द्वितीय वातानुकूलित
UB
Upper Berth
ऊपरी बर्थ
LB
Lower Berth
निचली बर्थ
SL
Side Lower
साइड लोअर
SU
Side Upper
साइड ऊपरी
22993 BDTS MHV SUP EXP, Bandra Terminus to Mahuva Jn runs Th, has classes 2A 3A SL GN. Pantry is not available. Fare does not include food cost. Total travel time of the train is 15 hr, 45 min. Average speed is 56 km/hr. Advance reservation period (ARP) is 120 days. The train is owned by Western Railway (WR). Its rake is shared with . Superfast fare is applicable. It is a Super Fast train. It is a Broad Gauge train.